吉泽明步伦理片_国产黄色av_中文字幕人妻无码一夲道蜜桃_白丝校花在我腿上呻吟jk

Language:CHINESESENGLISH

Home > News > FAQs
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.medcpap.com
What are the advantages of steel frame structures?
What are the advantages of steel frame structures? 1, Foshan Steel seismic function well: Because steel ductility, both weakened earthquake response, but also makes the steel resistant to intense earthquake deformation capacity; 2, light weight: th...
2014/7/16
Structural design is to meet the needs of
Structure that is designed to meet the needs of In highly urbanized undertaken today, the community on the construction of the engineering design of a higher demand, and structural engineering design as an integral part of the engineering design pl...
2014/7/9
Steel zinc corrosion spray aluminum spray technology advantages
Steel zinc spray antiseptic spray aluminum skill advantage United States because of the high labor costs, the cost of using arc spraying anti-corrosion construction is even lower than the heavy-duty paint. After decades of trials proved Foshan Steel ...
2014/6/21
Installation point supported glass curtain wall supporting structural members shall comply with the requirements of
Device point supported glass curtain wall supporting structural members shall comply with the following requirements: 1, Foshan steel device during system holes, assembly, welding and painting processes should comply with "steel construction and acce...
2014/6/18
Steel construction precautions in the snow
Matters snow weather steel construction should be noted that, due to low temperature and reduced visibility in heavy snow should stop construction, more personal safety, in the rain, snow or even bad weather, Foshan Steel Company Multiple Reflections...
2014/6/14
After the snow sweeping steel roof snow to avoid collapse
Some steel construction collapsed at the beginning of the design there is a problem, some companies to reduce costs, casually invited guerrillas construction, the construction itself is low quality, so a bad weather, the problem is exposed, and this ...
2014/6/14
Steel plant welding process
Foshan Steel plant welding process Such issues directly affect the quality of the project are the main issues, so this type of problem must use professional testing tools through a professional testing company can detect, judge it, generally based on...
2014/6/11
Outstanding performance green steel works
Foshan Steel as green products have a good reputation, outstanding performance steel layout works 1) Heavy industrial plants; 2) Light steel door frame; 3) Multiple high-level steel layout; 4) large-span steel layout (grid, mesh shell, cable,...
2014/6/7
Things Digital Steel is to protect the
Things Digital Steel is to protect the Lifecycle Management Foshan Steel works including deepening planning, material procurement, manufacturing, installation of four stages. The number of components ranging from thousands of pieces of a project , a...
2014/6/4
Non-spatial layout construction layout system damage
Non- spatial layout construction layout system damage After the earthquake, the damage layout ( especially collapses ) and casualties caused by the damage is often much attention . In the prevention of earthquake failure Foshan Steel layout is inves...
2014/6/4
Frequently Asked Questions FAQs
Frequently asked questions , namely FAQ = Frequently Asked Questions, is pre-set to the partner may ask some questions of enterprises, and make the appropriate reply will quiz show on the site section. Is a question and answer form , the purpose is t...
2014/4/28
page:14   1  2  3  4  5  6  7  8  9  10  11  12  13  14  pervious 

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)