吉泽明步伦理片_国产黄色av_中文字幕人妻无码一夲道蜜桃_白丝校花在我腿上呻吟jk

Language:CHINESESENGLISH

Home > News > nshi chow 4 footbridge was built yesterday while open
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.medcpap.com

nshi chow 4 footbridge was built yesterday while open

Time:[2014-9-17]  Hits:5033

Aviation Road, Central Hospital of Enshi located at the pedestrian bridge to begin construction, construction workers ongoing network coordination, power streetlights GanXian transplanting, civilized construction site signage and other preparatory work settings. The same day, chow four pedestrian bridges at the same time started after the completion of greatly facilitate travel, ease urban traffic pressure.

Urban construction footbridge Enshi city government as one of the "Top Ten livelihood projects" in 2014, plans to position the larger urban traffic flow of people crossing the street building four Foshan steel pedestrian bridge, the exact location is located at the Central Hospital of Enshi Aviation Road, spring road in one hundred storage place, College Road, at the national University, College Road, Shi nation primary state at a total project investment of about 12 million yuan.

Beefing of four steel footbridge simple choice, such as the main bridge box girder cross section for simply supported steel straight beams, according to the road width settings, clear width at 3.0 m -4.2 m, 15.8 m span at -24.8 m; stairway for steel beams, clear width at 1.8 m -2.7 m; main bridge piers selection vase steel pier.

Currently, four pedestrian bridges have been the end of the preliminary design, bidding, etc., on September 15 the same time started, for completion by the end of December.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號