National maritime museum at the end of the steel structure completed
Time:[2016-1-6] Hits:4804
National maritime museum at the end of the steel structure completed
Guangzhou steel structure From the annual meeting of the national maritime museum built to promote recently learned that the national maritime museum subject construction progress is accelerated, the end of the month, the steel structure for the completion of major projects will be.
According to the plan, the national maritime museum before the end of march to end fine decoration, such as special tendering, procurement, basic completion by the end of June eaves outside curtain wall construction, basic completion of project construction, by the end of the first half of 2017 completion. Collection collection ways, the first opening plan 6000 to exhibit, the cumulative collection collection so far amounted to 48000, to meet the requirements of the exhibition exhibits near 4000, during which the humanities class displays 1000 pieces of or so, the opening exhibits meet rate was 50%, and the natural class displays 3000 pieces of or so, the opening exhibits meet rate was 70%. At the same time, for the needs of the opening to comb the collection information, recently has passed the bohai base to improve transformation and collection warehouse record packaging, 10093 pieces of precious collection smoothly move to a new warehouse. It is reported that next year the new collection exhibition of cultural relics in more than 2000 specimens, basic can meet the needs of the opening ZhanChen and research. Guangzhou steel structure